In modern electrical power systems,
protection relays are the first line of defense against faults, overloads, and abnormal operating conditions. To ensure they perform as expected, regular and precise testing is essential. A structured protection relay testing procedure helps engineers validate relay functionality before commissioning, during maintenance, and after system disturbances.

This guide answers the most asked technical questions about relay testing — from the procedures to tools and best practices.

 What Is the Testing Procedure for a Protection Relay?

Testing a protection relay involves simulating fault conditions and checking if the relay responds correctly. The procedure depends on the relay type (electromechanical, static, or digital/microprocessor-based), but the general steps include:

Step-by-Step Testing Procedure:

  • Visual Inspection – Check for any physical damage, loose wiring, or poor labeling. Confirm correct CT/VT wiring and polarity.
  • Isolation and Safety Preparation – De-energize the circuit (lockout/tagout procedures). Ground and discharge the circuit if necessary.
  • Secondary Injection Testing – Inject simulated voltage/current signals into the relay’s input. Verify response times, pickup values, and tripping functions.
  • Functional Testing – Test binary inputs/outputs, LEDs, alarms, and communication protocols (Modbus, IEC 61850).
  • Trip Circuit Verification – Simulate a fault and confirm actual trip signal reaches the circuit breaker.
  • Reset and Final Configuration Check – Ensure all settings match the protection coordination study.
  • Documentation & Reporting – Record all test results, device serial numbers, settings, and observations.

 How Do You Test a Protection Relay Step by Step?

Here’s a detailed look at a real-world field testing process used by protection engineers:

 Example: Overcurrent Relay Testing (IEC 51 or ANSI 50/51)

StepActionPurpose
1Connect secondary injection test setSimulate fault conditions
2Inject 1.0x, 1.5x, and 2.0x pickup currentDetermine pickup threshold
3Measure operating time at different currentsCheck time-current characteristics
4Test instantaneous (high-set) tripValidate fast protection
5Trigger binary input and monitor output tripEnsure full protection path works

Use software like Omicron Test Universe, Megger AVTS, or relay-specific tools (e.g., ABB PCM600) for automated testing.

What Tools Are Used for Protection Relay Testing?

Accurate relay testing relies on specialized tools. The most used equipment includes:

 Hardware:

  • Secondary Injection Test Sets: Omicron CMC, Megger SMRT, Doble F6150
  • Primary Injection Units (for breaker/CT tests)
  • Multimeters & Clamp Meters
  • Current Injection Transformers
  • Logic Analyzers for Binary Inputs

 Software:

  • ABB PCM600, Siemens DIGSI, Schneider MiCOM S1
  • Omicron Test Universe, Doble Protection Suite

 Accessories:

  • Test leads, protective gloves, phase rotation meters, USB-serial converters

Always calibrate test equipment before critical relay testing campaigns.

What Are the Common Relay Testing Mistakes to Avoid?

Engineers working in substations and industrial plants often repeat these five critical mistakes:

  • Incorrect Settings – Loading outdated configuration files or using incorrect pickup values.
  • Skipping Functional Tests – Only testing trip logic without confirming binary I/Os, alarms, or LEDs.
  • CT/VT Polarity Errors – Causing maloperation or relay not detecting faults at all.
  • No Field Verification – Relying solely on simulation, not testing with actual breakers/field connections.
  • Ignoring Manufacturer Guidelines – Each relay model has unique specs; ignoring manuals causes misoperation.

How Often Should Protection Relays Be Tested?

The testing interval depends on application criticality, industry standards, and past performance. General recommendations:

Industry/ApplicationTesting Interval
Power Utilities (HV/MV)Every 2–3 years
Data CentersAnnually
Cement, Steel, Petrochem2 years (or post-shutdown)
After Fault or OutageImmediate retesting
New CommissioningBefore energization

Standards like IEC 61850, IEEE C37, and NERC PRC provide detailed test intervals and procedures.

Final Tips for Field Engineers

  • Always simulate both normal and fault conditions.
  • Save relay configuration backups after testing.
  • Use approved PPE and follow electrical safety protocols.
  • Keep detailed test reports for QA/QC and audits.

 Conclusion

Mastering the protection relay testing procedure is essential for any electrical engineer working in substations, power plants, or industrial settings. Proper testing ensures equipment protection, reduces downtime, and keeps people and assets safe.